Wuwei County Builds a Strong Smart Grid for the Twelfth Five-Year Plan

With the economic development of Anhui Wuwei County, the demand for electricity will have higher requirements. It is expected that by the end of the “Twelfth Five-Year Plan”, the maximum load of Wuwei County will reach 400,000 kilowatts, and the annual electricity consumption will exceed (reach) 2 billion kilowatt-hours. In order to adapt to the economic development of the county during the “Twelfth Five-Year Plan” period, Wuwei County plans to invest 1.4 billion yuan to build a strong smart grid and promote the continuous economic development of the county.

According to Wuwei County's "12th Five-Year Plan" power grid planning and rural network transformation and upgrading of 6 years (2010-2015) planning projects, during the "Twelfth Five-Year Plan" period, Wuwei County's domestic power grid construction major projects are:

A new 500 kV Fudu Substation will be built, with an additional capacity of 2.25 million kVA (3×75 million kVA) for the main transformer and two new 500 kV Fudu Substations supporting two 500 kV lines with a length of 2×150 km. The substation plans to invest 400 million yuan, 500 kV line investment 150 million yuan, a total investment of 550 million yuan; a new 220 kV Tanggou substation, the new capacity of 360,000 kVA (2 x 180 kV An), newly build 220 kV Tanggou to support 220 kV line 2, the line length of about 81 km; planned total investment of 278 million yuan; new 110 kV substation, 4 main transformers, capacity 200,000 kVA Expansion of 110-kilovolt Yau Tung change and south Yunnan, adding one each of the new main transformers, each with a capacity of 50,000 kVA; during the “Twelfth Five-Year Plan”, a total of 4 new 35 kV lines will be planned with a length of 49.5 kilometers. The transformation of 35 kV lines 9, the length of 112.3 kilometers.

In addition, during the “Twelfth Five-Year Plan” period, Wuwei County also plans to reconstruct 107 107KV lines and 1991.9km of its transformation lines; to transform 2470 substations with a capacity of 351,391KVA; to transform 10KV lines in the station area; 161 kilometers, transform the low-voltage line 3082 kilometers.

During the "Twelfth Five-Year Plan" period, Wuwei County will build a strong smart grid by investing 1.4 billion yuan. By then, Wuwei County's grid structure and scale will leap to a new level.

Open Frame For Resistive Touch All-in-one

Green Touch's self-developed 5A series of open frame touchscreen computers can support Windows, Linux, Android operating systems, with excellent functionality and flexibility, and provide you with reliable commercial and industrial-grade solutions. The 5A series adopts modules. Designed with diverse and powerful functions, it can be used in public environments such as in-store human-computer interaction, operating system cashiers, self-service, hotel services, and corporate offices. It has a wide range of uses, provides a variety of sizes and configuration options, and has versatility for cross-environmental use , sturdy and durable, can meet the needs of continuous public use.

* Display Type: Active Matrix TFT LCD, LED Backlight

* Touch Typeâ‘ :PCAP ,10 Points Touch

* Touch Typeâ‘¡:Infrared ,10 Points Touch

* Touch Typeâ‘¢:4 Wire Resistive/5 Wire Resistive,Single Touch

* Extra Video Output:1*VGA,1*HDMI

* Motherboard:Inter I3,I5,I7

* Supported OS:Windows,Android,Linux

* Certificates:UL,FCC,CE,CB,HDMI


* Warranty:1 Year

Open Frame Touch Computer


Open Frame Touch All In One PC


Open Frame Touch All In One Computer




Commercial All-in-one Machine



Open Frame Touch Computers,Open Frame Touch All In One PC,Open Frame Touch All In One Computer,Commercial All-in-one Machine

ShenZhen GreenTouch Technology Co.,Ltd , https://www.bbstouch.com